Wind Energy Development Managers
On the block
A large share of this job's tasks are exposed to AI.
More exposed than 74% of the 923 occupations we track (rank #226).
Lead or manage the development and evaluation of potential wind energy business opportunities, including environmental studies, permitting, and proposals. May also manage construction of projects.
Also covers: Business Development Director, Business Development Manager, Development Director, Development Manager, Project Development Leader, Renewable Project Management and Construction Director, Energy Director, Energy Project Director
Task breakdown
Shares are weighted by how important each task is to the job (O*NET importance ratings).
Make it your job. Every role is different. Untick the tasks you don't do, and the score, reliability and costs on this page update to match.
All 15 tasks included.
AI already used for this 1 task
AI could do this 11 tasks
Human for now 3 tasks
Is AI worth the cost here?
For a typical task AI is already used for in this job, with retries counted:
There isn't enough time data on the AI-used tasks you picked to compare costs. Tick more tasks above to see it again.
Token prices would have to rise about 47× before AI stops saving money here when people chat with it, or about 8× when an AI agent does the work on its own, because agents use far more tokens.
Will token prices go up?
Nobody knows. Some analysts argue that today's prices for the biggest models are below what they cost to run, kept low by investor money, and will rise. There are early signs, such as AI tools moving heavy users to usage-based pricing. On the other hand, research from Epoch AI andMITfinds that the price of a given level of AI capability has fallen 5–50× a year. At the same time, tasks are using more tokens, especially with agents. Pick a price scenario above to see what each would mean.
Times and success rates come from real usage in the Anthropic Economic Index; wages from the U.S. Bureau of Labor Statistics (2021). How many tokens a task uses isn't published anywhere, so that part is our estimate. How this is calculated.
How to work with AI in this job
Based on how AI actually performs on each task in real use:
Worth using AI for
In real use, AI clearly completed these at least 70% of the time. Use it to save time, and still give the result a quick look.
- Review or evaluate proposals or bids to make recommendations regarding awarding of contracts. · AI succeeds 77%
Use AI, but check everything
AI is used for these but often falls short, or it could help but hasn't been proven in real use yet. Treat what it gives you as a first draft.
- Manage wind project costs to stay within budget limits. · not yet seen in real use
- Create wind energy project plans, including project scope, goals, tasks, resources, schedules, costs, contingencies, or other project information. · not yet seen in real use
- Develop scope of work for wind project functions, such as design, site assessment, environmental studies, surveying, or field support services. · not yet seen in real use
- Provide verbal or written project status reports to project teams, management, subcontractors, customers, or owners. · not yet seen in real use
- Update schedules, estimates, forecasts, or budgets for wind projects. · not yet seen in real use
- Prepare or assist in the preparation of applications for environmental, building, or other required permits. · not yet seen in real use
- Manage site assessments or environmental studies for wind fields. · not yet seen in real use
- Prepare wind project documentation, including diagrams or layouts. · not yet seen in real use
- Review civil design, engineering, or construction technical documentation to ensure compliance with applicable government or industrial codes, standards, requirements, or regulations. · not yet seen in real use
- Prepare requests for proposals (RFPs) for wind project construction or equipment acquisition. · not yet seen in real use
- Provide technical support for the design, construction, or commissioning of wind farm projects. · not yet seen in real use
+ 6 more in the task list above
Your edge
AI isn't doing these. They lean on judgment, people or hands-on work, and they're where getting better pays off most.
- Coordinate or direct development, energy assessment, engineering, or construction activities to ensure that wind project needs and objectives are met.
- Lead or support negotiations involving tax agreements or abatements, power purchase agreements, land use, or interconnection agreements.
- Supervise the work of subcontractors or consultants to ensure quality and conformance to specifications or budgets.
Where you could move
Jobs from O*NET's list of occupations related to this one that score at least 10 points lower and need at most a little more preparation. Pay is the U.S. median wage (2021), compared with $59.93/hour here.
- 31Wind Energy Operations Managers11 points lower · less preparation · $59.93/hour (±0%)
- 24Hydroelectric Production Managers18 points lower · less preparation · $49.59/hour (−17%)
- 31Geothermal Production Managers11 points lower · less preparation · $49.59/hour (−17%)
- 22Solar Energy Installation Managers20 points lower · less preparation · $34.62/hour (−42%)
- 4Wind Turbine Service Technicians38 points lower · less preparation · $27.05/hour (−55%)
Switching jobs usually means new skills, and sometimes new credentials or licenses. Treat this as a starting point, not a plan.
Skills to build
From O*NET's skill ratings for this job, matched to its tasks through O*NET's links between tasks, work activities and skills. These are patterns in the data, not a guarantee.
Lean into
Skills this job relies on that are most tied to the tasks AI isn't doing.
- SpeakingTalking to others to convey information effectively.73% of the work it's used for stays human
- CoordinationAdjusting actions in relation to others' actions.76% of the work it's used for stays human
- Active LearningUnderstanding the implications of new information for both current and future problem-solving and decision-making.81% of the work it's used for stays human
- NegotiationBringing others together and trying to reconcile differences.81% of the work it's used for stays human
For a move
Skills the jobs under "Where you could move" need at a higher level than this one does.
- Operations MonitoringWatching gauges, dials, or other indicators to make sure a machine is working properly.Needed more by Wind Energy Operations Managers, Hydroelectric Production Managers and 3 more
- Quality Control AnalysisConducting tests and inspections of products, services, or processes to evaluate quality or performance.Needed more by Wind Energy Operations Managers, Hydroelectric Production Managers and 2 more
- Management of Personnel ResourcesMotivating, developing, and directing people as they work, identifying the best people for the job.Needed more by Wind Energy Operations Managers, Geothermal Production Managers and 1 more
Less of an edge on their own: Reading Comprehension. This job needs them, but they go mostly with tasks AI is already used for or could do. They still matter; pair them with the skills above.
Exposed doesn't mean replaced
The score measures how much of this job AI can touch. Whether it actually replaces anyone depends on more than that:
- AI isn't reliable enough to work unchecked. In real use, AI clearly completed this job's AI-used tasks in only about 77% of conversations. In the rest, it fell short or the outcome wasn't clear, so a person still has to check the work.
- AI isn't always cheaper. Simple work like emails runs fine on small, almost free models, but complex work needs large models that cost far more to run, and someone still has to set up, check and maintain the system. An MIT study found that only 23% of the wages paid for tasks that computer vision could do would actually be cheaper to automate at today's costs. See the cost comparison above for this job.
- Someone still owns the result. Much real AI use is people working with AI rather than AI working alone, and even when AI does the work, a person stays accountable for the outcome.